首页
登录
职称英语
If the building project______by the end of this month is delayed, the constructi
If the building project______by the end of this month is delayed, the constructi
游客
2023-10-20
75
管理
问题
If the building project______by the end of this month is delayed, the construction company ______fined.
选项
A、will be completed: is to be
B、to be completed: will be
C、being completed: will be
D、completed: was
答案
B
解析
句意:如果这个计划在月底完成的建设项目被推迟的话,建筑公司一定会被罚款的。动词不定式表示将来,一般是按计划安排或者是注定做某事。由于被罚款是将来的事,所以用将来时态。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3114765.html
相关试题推荐
[originaltext]M:Iwanttousetheoverheadprojectorformypresentation.[1]C
[originaltext]M:Iwanttousetheoverheadprojectorformypresentation.[1]C
A.providesB.duetoC.constructionD.serving
A.providesB.duetoC.constructionD.serving
A.providesB.duetoC.constructionD.serving
A.providesB.duetoC.constructionD.serving
A.providesB.duetoC.constructionD.serving
A.providesB.duetoC.constructionD.serving
Youaredoingaminiresearchprojectonpeople’sdonationtocharity.Thef
Youaredoingaminiresearchprojectondiets.Thefollowingaresomeusefu
随机试题
•Readtheletterbelowaboutthecompany.•Choosethebestwordtofilleachg
Ifx,yandzarepositiveintegerssuchthatxisafactorofy,andxisamul
Manycountriesexistinthisworld.Howtodealwiththeproblemsamongthe
水域面积waterarea
根据虫情预报,农业物资供应公司做好农药储备属于( )。A.现场控制 B.前馈
男性,32岁。工作时不慎被锐器刺伤右足底19小时。伤后仅在当地诊所作简单局部消毒
(2016年真题)证券公司应当自每月结束之日起( )个工作日内.报送月度报告。
适度消费伦理观是以( )为基本特征的消费价值观。A.节约型 B.生态化 C
下列绩效奖励计划中,属于长期奖励计划的是( )。A.现股计划 B.开发新产品
关于平行结转分步法,下列说法中不正确的是()。A.计算各步骤成本时,不计算各步骤
最新回复
(
0
)