首页
登录
职称英语
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
游客
2023-10-18
59
管理
问题
How many pre-constructed sections are made on land? [br]
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、Ships at sea.
B、A train from the opposite direction.
C、The powerful ocean.
答案
C
解析
最后Professor Massa提到Maglev train的不好之处就在于海洋的巨大威力对海底隧道有很大的威胁。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3109280.html
相关试题推荐
[originaltext]TheBottledWaterThe
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
随机试题
OncehestartstalkingaboutChineseorforeignaffairs,ancientormodern______
以下对于X线滤过的叙述,错误的是A.铜板能作为滤过板使用 B.X线摄影中只有固
热力管道的安装,水平管道变径时应采用偏心异径管连接。当输送介质为蒸汽时,其安装要
下列不属于综合理财规划建议书作用的是()。A:认识当前财务状况 B:明确现有问
共用题干 HospitalMistreatmentAccordingto
Thechangeinthatvillagewasmiraculou
患者女,35岁。2个月前被诊断为1型糖尿病,遵医嘱注射胰岛素,1个月后自感无不适
A.阻碍核苷酸合成 B.与DNA连接而破坏DNA的结构和功能 C.与DNA结
某工程项目的进度计划如下单代号网络图所示,时间单位为周。 下列工作
国外的项目管理咨询公司中,工程师的根本任务是进行建设工程的()。A.进度控制
最新回复
(
0
)