首页
登录
职称英语
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
游客
2023-10-18
13
管理
问题
How many pre-constructed sections are made on land? [br]
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、They don’t use rails.
B、They run under water.
C、They travel at high speed.
答案
A
解析
Maglev train不使用轨道,因此没有噪音。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3109279.html
相关试题推荐
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]M:Goodmorning,Faith.Inlightof(根据,鉴于)therecenteconomicd
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
随机试题
WheretoGetHealthierin201
Formanypeopletoday,readingisnolongerrelaxatioaTo【C1】______theirwor
( )是指一个产业内执行同样或相似战略并具有类似战略特征或地位的一组企业。A.
下列有关办理会计移交手续的表述中,正确的有()。A.会计主管人员办理交接手续,由
以满足社会公众公共需要、谋求社会效应为目的,所形成的资产一般处于非生产经营领域的
在城市发展条件综合评价的方法中,定性方法一般适用的条件不包括( )。A.研究对
(2015年11月)( )属于人力资本投资中的有形支出。A.学费 B.保健支
()不属于银行资产托管业务范围。A.委托资产托管 B.企业年金托管 C.自
不属于替牙期间特点的是A.上颌侧切牙牙根向远中倾斜 B.前牙轻度深覆关系 C
下列选项不属于BIM技术现场质量管理流程的是( )。A.创建质量管理模型 B
最新回复
(
0
)