首页
登录
职称英语
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
How many pre-constructed sections are made on land? [br] [originaltext]M: Good
游客
2023-10-18
73
管理
问题
How many pre-constructed sections are made on land? [br]
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、They don’t use rails.
B、They run under water.
C、They travel at high speed.
答案
A
解析
Maglev train不使用轨道,因此没有噪音。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3109279.html
相关试题推荐
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]M:Goodmorning,Faith.Inlightof(根据,鉴于)therecenteconomicd
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
随机试题
Andersonwasdisappointedwhenhefoundouttheyhadgonetothetest-site______
Theclimatephenomenonthatisbeingblamedforfloods,hurricanesandearly
标准实施的原则包括()。A.必须严格执行强制性标准 B.企业采用了推荐性标准
防水泵运转产生的噪音干扰要从()。A.水泵机组隔振 B.管道隔振 C.支架
下列各组溶液中,具有缓冲溶液性质的是()。A. B. C. D.
各种运输方式内外部的各个方面的构成和联系,就是( )。 A.运输系统
在进行工程成本核算时,需要正确划分的成本费用的界限有()。A.工程成本
用人单位有证据证明,劳动争议仲裁委员会作出的终局裁决违反法定程序,可以自收到仲裁
混凝土粗集料最大粒径不应超过钢筋净间距的()。A.1/4 B.1/2 C.3
某承包商承揽的住宅工程项目,由于业主对于相关设计修改迟迟拿不定主意,致使一项工作
最新回复
(
0
)