How many pre-constructed sections are made on land? [br]
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、They don’t use rails.
B、They run under water.
C、They travel at high speed.
答案
A
解析
Maglev train不使用轨道,因此没有噪音。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3109279.html
相关试题推荐
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]W:PeterGarrett,theSchoolEducationMinister,hasjoinedusin
[originaltext]M:Goodmorning,Faith.Inlightof(根据,鉴于)therecenteconomicd
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Hi,didyouhearaboutmyupcomingtriptoNewYork?M:Ithin
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
[originaltext]W:Marion,attheschoolyouworkat,dothechildrenwearunifor
随机试题
Aprofessorwroteinhismicroblog,"Povertyforthosewithhigher-educatio
Atleast600,000jobscoulddisappearintheUKthisyear,accordingtoare
健身器材fitnessfacility
Directions:Anintroductorysentenceforabriefsummaryofthepassageisprovi
《泡沫灭火系统设计规范》(GB50151)适用于船舶、海上石油平台等场所设置的泡
信息系统的()是指系统可能存在着丧失结构、功能、秩序的特性,这个特性往往是隐藏不
(2012年)纳税人或扣缴义务人对税务机关作出的具体行政行为不服,可以申请行政复
下段食管癌的治疗多采用( )。A.手术治疗 B.放射治疗 C.化学治疗
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
下列工程中,属于民航专业工程的有( )。A.飞行区排水工程 B.飞行区消防管
最新回复
(
0
)