How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、54,000.
B、45000
C、50000
答案
A
解析
采访中Professor Massa告诉主持人一共有54,000个部件。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3109276.html
相关试题推荐
[originaltext]CarbonFootprintAca
[originaltext]SpaceJunkSpacejunk
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
随机试题
There______nothingmorefordiscussion,themeetingcametoanendhalfanhour
[originaltext]TheGoldenGateBridgejoinsthebeautifulcityofSanFranci
[originaltext]Iwas9yearsoldwhenIfoundoutmyfatherwasill.Itwas
DefinitionsofObesityA)Howdoesonedefinewhena
Thefarmers’houses,whichlocateinthevalley,areenclosedby______andfenc
对产品功能的分析评价是技术评价内容不能缺少的方面。当参与对比的设计方案功能项目和
甲状腺危象不表现为A.休克 B.昏迷 C.脉率增快 D.高热 E.血压增
关于建设工程施工合同分析的说法,错误的是( )。A、合同分析主要由企业的合同管
国际产能和装备制造合作的主要任务有( )。A.立足国内优势,推动钢铁.化工行业对
某政府投资建设一工程项目,通过工程量清单招标确定某承包商为该项目中标人,并签订了
最新回复
(
0
)