首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2023-10-17
54
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D8】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
packaging
解析
(根据录音中的“So the average time it takes for packaging is 5 minutes per box”可知,每盒平均所需要的包装时间是5分钟。故填packaging,表示“包装”。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3104876.html
相关试题推荐
You____yourtoothpulledoutbeforeitrotcompletely.A、hadbettergotB、hadto
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
Whichofthefiguresbelowthelineofdrawingsbestcompletestheseries?[img]
Completethepuzzlebyfittingthefivewordsontheright-handsideofthegrid
Whichofthefiguresbelowthelineofdrawingsbestcompletestheseries?[img]
—WouldyoumindansweringafewquestionsforasurveyI’mdoing?—______—Howd
Whichofthefiguresbelowthelineofdrawingsbestcompletestheseries?[img]
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26~30,completethenotesusingno
SummaryListentothepassage.Forquestions26~30,completethenotesusingno
随机试题
Anadultgiraffe’sheadisaboutsixfeetaboveitsheart.Thismeansthatto【C
Depression[A]Inbed,youtossandturn,unableto
点型火灾探测器周围1.5m内,不应有遮挡物.
甲向乙借款1万元,而乙欠甲3万块砖。甲的债务于2009年2月9日到期,乙的债务于
()是流动资产中最重要的组成部分,常常达到流动资产总额的一半以上。A.现金
简述数学问题设计的原则。
既能清热燥湿,又能泻肝胆实火的是A.龙胆草 B.夏枯草 C.仙鹤草
(2017年真题)根据《商业银行风险监管核心指标》,我国商业银行不良贷款率不得高
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
根据NEC《工程施工合同》,签订合同时,价格已经确定的合同属于( )。A.管理合
最新回复
(
0
)