首页
登录
职称英语
RecipePotatoes and Cucumber
RecipePotatoes and Cucumber
游客
2023-10-03
23
管理
问题
Recipe
Potatoes and Cucumber with Parsley
2 potatoes, about 3/4 pound
1 cucumber, about 3/4 pound
1 tablespoon butter
1 tablespoon finely chopped parsley
Salt and pepper to taste
Peel the potatoes. Split them in half, and then cut into quarters.
Put the potatoes in a small skillet with water to cover. Bring to the boil and cook about 10 minutes. Meanwhile scrape the cucumber. Cut it into 11/2 inch lengths. Cut each length in half. When the potatoes have cooked 10 minutes, add the cucumbers. Cook about four minutes. Drain. Add the butter to the vegetables and toss. Sprinkle with parsley, salt and pepper to taste, and serve. Yielding: 4 servings.
Potatoes and Cucumber with Parsley is made up of 2 potatoes, (46) , 1 tablespoon butter,
1 tablespoon finely chopped parsley and (47) to taste.
The potatoes will be finally cut into (48) .
The potatoes should be cooked earlier than (49) .
Add (50) to the vegetables and toss.
[br]
选项
答案
the cucumbers
解析
答案在文章句子When the potatoes have cooked 10 minutes,add the cucumbers.Cook about four minutes.Drain.中
转载请注明原文地址:https://www.tihaiku.com/zcyy/3068663.html
相关试题推荐
RecipePotatoesandCucumber
RecipePotatoesandCucumber
RecipePotatoesandCucumber
RecipePotatoesandCucumber
RecipePotatoesandCucumber
A—potatoB—carrotC—onionD—garlicE—gingerF—tomatoG—cabbageH—cucumberI—corn
A—potatoB—carrotC—onionD—garlicE—gingerF—tomatoG—cabbageH—cucumberI—corn
A—potatoB—carrotC—onionD—garlicE—gingerF—tomatoG—cabbageH—cucumberI—corn
A—potatoB—carrotC—onionD—garlicE—gingerF—tomatoG—cabbageH—cucumberI—corn
A—potatoB—carrotC—onionD—garlicE—gingerF—tomatoG—cabbageH—cucumberI—corn
随机试题
Energydrinksareastapleamongcollegestudentsandclubkids,andthey’re
持仓量增加表明资金流入市场,反之则表明资金流出市场。()A、正确B、错误A持仓量增加表明资金流入市场,反之则表明资金流出市场。
Duringthepastfewweeks,newspapersonbothsidesoftheAtlantichavereveale
[originaltext]Wheredoesthemanwanttogo?[/originaltext]A、England.B、Germany
D
贝克曼梁测定路基路面回弹模量方法适用于土基或厚度不小于1m的粒料整层表面。
下列哪种情况不必增加基牙()A.桥体跨度长 B.基牙牙冠缺损严重
A.胎龄37~42周 B.胎龄>42周 C.胎龄38~43周 D.胎龄<3
地下连续墙的施工工序不包括( )。A.导墙施工 B.槽底清淤 C.吊放钢筋
最新回复
(
0
)