首页
登录
职称英语
[originaltext] (32)The world’s first completely automatic railway has been b
[originaltext] (32)The world’s first completely automatic railway has been b
游客
2023-09-03
59
管理
问题
(32)The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. (33)Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. (34)If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots." The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. (35)Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
32. What happened to the London underground railway over four decades ago?
33. Who checks and collects the tickets on the Victoria Line?
34. What is the task of the one worker on the Victoria Line train?
35. What will happen on the line if each train moves at its own speed?
选项
A、There will be danger of accidents on the line.
B、The train will run off the rails.
C、Their speeds will be automatically fixed by the computers.
D、The train will keep a safe distance from each other.
答案
A
解析
推理判断题。短文指出会有机器设定火车的速度,使其保持安全距离,这样就不会有碰撞的危险。由此可知,如果每列火车都按自己的速度任意行驶,不互相照应,就会有发生事故的危险。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2982639.html
相关试题推荐
Theoldladyhasdevelopeda______coughwhichcannotbecuredcompletelyina
Theirdiplomaticprinciplescompletelylaidbaretheir_________forworldconqu
Theexaminationquestion______mecompletelyandIcouldn’tanswerit.A、blocke
Shesatdowntowriteheressay,butfoundshewascompletelywithout______.A、st
[originaltext]W:Areyoureallygoingtoquityourjob?M:Well...I’mnotsure.
[originaltext]W:Youcaneithergowithmeoryoucanstayhereattheapartmen
[originaltext]W:Youcaneithergowithmeoryoucanstayhereattheapartmen
[originaltext]W:Youcaneithergowithmeoryoucanstayhereattheapartmen
[originaltext]W:Youcaneithergowithmeoryoucanstayhereattheapartmen
[originaltext]Wethinkofaerobicsasbeingahighimpactactivitybutactu
随机试题
Immigrationposestwomainchallengesfortherichworld’sgovernments.One
Readingstorybooksisbetterforchildrenthanwatchingtelevisionorplayi
ThecriminalthepolicehadcaughtwasanEnglishman.[br]PaulandNorafinally
PassageTwo(1)Whatwouldtheholidaysbewithoutlotsoftinytwinkli
Whenaninventionismade,theinventorhasthreepossiblecoursesofaction
对防火间距进行实地测量时,沿建筑周围选择相对较近处测量间距。下列关于防火间距测量
A.虫媒传播 B.接触传播 C.母婴传播 D.消化道传播 E.呼吸道传播
以下哪项是青蒿的现代应用是A贫血 B低血压 C高血压 D室性早搏 E高热
在进行跨部门团队绩效考评时,由()进行最后的考评并确定每个员工的最终绩效考评结
编制单位工程施工进度计划的工作包括:①计算劳动量和机械台班数;②计算工程量;③划
最新回复
(
0
)