首页
登录
职称英语
Today, most countries in the world have canals. Some canals, such as the Sue
Today, most countries in the world have canals. Some canals, such as the Sue
游客
2023-09-03
66
管理
问题
Today, most countries in the world have canals. Some canals, such as the Suez or the Panama,【C1】______ ships weeks of time by making their voyage a thousand miles shorter. Other canals permit boats to reach cities that are not located on the coast.【C2】______ other canals drain lands where there is too much water, help or【C3】______ fields where there is not enough water.
The【C4】______ of a canal depends on the kind of boats going through it. The canal must be wide enough to permit two of the【C5】______ boats using it to【C6】______ each other easily. It must be deep enough to leave about two feet of water【C7】______ the keel of the largest boat using the canal.
Some canals have sloping sides, while others have sides that are nearly【C8】______ Canals that are cut through rock can have nearly Vertical sides.【C9】______ , canals with earth banks may【C10】______ if the angle of their sides is too steep. Some canals are lined with brick, stone, or concrete to keep the water【C11】______ soaking into the mud. This also permits ships to go at【C12】______ speeds, since they cannot make the banks fall in by【C13】______ up the water. In small canals with mud banks, ships and barges (大平底船) must【C14】______ their speed.
When the canal goes【C15】______ different levels of water, the ships must be【C16】______ or lowered from one level to the other. This is generally done by【C17】______ of locks. If a ship wants to go Up to higher water, the lower end of the lock opens to let the boat in. Then this gate closes, and the water is let into the lock chamber from the upper level. This raised the level of the water in the lock 【C18】______ it is the same as the upper level of water. Now the upper gates can be opened to【C19】______ the ship into the higher water. Sometimes a canal contains a series of locks when the【C20】______ in levels is very great. [br] 【C16】
选项
A、raised
B、promoted
C、hoisted
D、alleviated
答案
A
解析
由表示选择的连词or可知所填词与lowered意义相对,lower的反义词是raise,故选A,表示船随着水位的变化而上升或下降。Bpromoted“提升”,常指提升position或rank;Choisted“举起,升高”,一般指借助机械手段提起,不符合此处语境;Dalleviated“缓和,减轻”,不符合句意。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2982431.html
相关试题推荐
Chinaisoneofthelargestcountriesintheworld,herterritorybeingabout__
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
[originaltext]About25millionchildrenindevelopingcountrieshavenohom
[originaltext]About25millionchildrenindevelopingcountrieshavenohom
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
随机试题
•Lookatthenotesaboutanenterprise.•Someinformationismissing.
在两条单线载客运营地下区间之间应设置联络通道,相邻两条联络通道之间的最小水平距离
福建土楼民居的外墙很厚,其作用主要是为了:[2005-078]A.保温与隔热
缆风绳如影响吊装作业,可以临时拆除,待吊装完成后及时回复。
患者,女性,27岁,停经10周。晨起恶心、呕吐。妇科检查:阴道和子宫颈充血,宫体
下列选项中,符合所给图形的变化规律的是________。
演示文稿PowerPoint的基本组成单元是幻灯片.下列工具栏按钮可以插入新幻灯
再贴现业务的期限最长不超过( )个月。A.3 B.6 C.9 D.12
下列工程量中,监理人应予计量的有( )。A.发包人设计变更增加的工程量 B.承
某学院宿舍楼工程,因学员安置需要,在未经验收情况下就投入使用,使用2年后部分卫生
最新回复
(
0
)