首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-09-03
61
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains.
This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; and it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、To drive the train after it is started automatically.
B、To start the train and drive it when necessary.
C、To take care of the passengers in the train.
D、To send commanding signals to the command spot.
答案
B
解析
What is the task of the one worker on the Victoria Line train?
转载请注明原文地址:https://www.tihaiku.com/zcyy/2980849.html
相关试题推荐
[originaltext]Astronomershavediscoveredapotentiallyhabitableplanetofsim
[originaltext]SpeakingattheSustainableDevelopmentconferenceinLondon,Bri
[originaltext]SpeakingattheSustainableDevelopmentconferenceinLondon,Bri
[originaltext]W:Dr.Anderson,couldyoupleaseclarifytherequirementsforth
[originaltext]M:I’vejustbroughtyourladderback,Mrs.Fielding.Thanksfor
[originaltext]M:I’vejustbroughtyourladderback,Mrs.Fielding.Thanksfor
[originaltext]W:CanItalktoyouforaminuteaboutthehistoryassignment,P
[originaltext]W:CanItalktoyouforaminuteaboutthehistoryassignment,P
[originaltext]W:CanItalktoyouforaminuteaboutthehistoryassignment,P
[originaltext]W:CanItalktoyouforaminuteaboutthehistoryassignment,P
随机试题
[originaltext]Here’saquestionforyou.Whataretheliberalarts?Thelibe
Tourist:Howmuchisthatring,please?Vendor:Only$200,sir.Tourist:______
由于眼球前后径过长而导致眼的折光能力异常称为( )A.近视 B.远视
公路网中最高层次的骨干通道是()。A.地方道路网 B.省级道路网 C.高速
A.POX强阳性B.细胞内、外铁明显减少C.PAS阳性D.α-NAE强阳性E.N
证券自营业务运作管理重点主要有()。A:控制运作风险 B:确定运作原则 C:
石斛是我国传统的名贵中药材,在传统古典中药书籍中均有记载,并将其列为药材之"上品
碾压混凝土施工质量评定时,钻孔取样芯样获得率主要是评价碾压混凝土的()。A.均
由于铁路运输部门原因,承包方施工机械未按期运入现场,导致工期延误,该种工期延误属
【教材已删除】某建筑工程报告期各项费用构成和各单项价格指数如下表所示,则该工程的
最新回复
(
0
)