首页
登录
职称英语
[originaltext] (33)London has become a cycle friendly zone after the launch
[originaltext] (33)London has become a cycle friendly zone after the launch
游客
2023-09-02
43
管理
问题
(33)London has become a cycle friendly zone after the launch of a new bike hire scheme, which has been designed to encourage more people to cycle in and around central London. So how does it work? First you have to sign up to the scheme to get a key to unlock one of the bikes, which are kept at docking stations (中转站) in and around central London. (34) You have to pay an access fee for the key and then you pay as you go, for the length of time you use the bike. Transport for London, which runs the scheme, are hoping to have 6 000 bikes and 400 docking stations in place by the end of the year. It is hoping to ease congestion in London and is expected to generate up to 40 000 extra cycle trips a day into the city centre. London Mayor Boris Johnston launched the scheme and said London had been "filled with thousands of gleaming machines that will transform the look and feel of our streets and become as commonplace on our roads as black cabs and red buses." However, there have been a few glitches (小故障) since the scheme was launched last Friday. On the first day some people found they couldn’t dock their bike properly and their usage of the bike had not registered. (35)Transport for London did admit they had been expecting a few "teething problems" and have said they would abandon the charges for the first day as a "gesture of goodwill." Some other people have criticized the lack of docking stations and locks for the bikes as well as the price it costs to hire the bicycles.
33. According to the study, what is the aim of the bike hire scheme?
34. How does the scheme work according to the passage?
35. What will Transport for London do with the charges for the first day?
选项
A、Ask users to sign up for the scheme.
B、Have more docking stations in place.
C、Lower the price it costs to hire the bicycles.
D、Give up charges as a gesture of goodwill.
答案
D
解析
事实细节题。短文最后指出,这一计划实行的第一天,就有人发现无法正确停车,他们对自行车的使用也没有登记。对此,伦敦交通局也承认,计划实施初期有一些问题,但是为表达诚意,他们提出免除第一天用车的收费。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2978325.html
相关试题推荐
[originaltext]Earthquakesaresomethingthatmostpeoplefear.Thereareso
[originaltext]Earthquakesaresomethingthatmostpeoplefear.Thereareso
[originaltext]Manystudentstrytostudythewholenightanddonotsleepb
[originaltext]Manystudentstrytostudythewholenightanddonotsleepb
[originaltext]Architectureistobuildingasliteratureistotheprintedw
[originaltext]M:I’mEllanandIworkfortheStudentUnion.CanIaskyouafe
[originaltext]M:Goodafternoon.Iwonderifyoucouldgivemesomeinformation
[originaltext]M:Goodafternoon.Iwonderifyoucouldgivemesomeinformation
[originaltext]Forcenturies,parrotshavebeenprizedpetsbecauseoftheir
[originaltext]Forcenturies,parrotshavebeenprizedpetsbecauseoftheir
随机试题
Smoking,whichmaybeapleasureforsomepeople,isaserioussourceofd
Humanity’sprimal(原始的)effortstosystematizetheconceptsofsize,shapes,
A、Bycuttingitintopiecesandputthemintofridge.B、Bymakingitintopieso
中华人民共和国的成立标志着中国进入()A.资本主义社会 B.社会主义初级阶段
下列哪项不是天南星的适应证()。 A.寒痰 B.湿痰 C.燥痰 D.顽痰
各种运输方式内外部的各个方面的构成和联系,就是( )。 A.运输系统
()只能给出比较粗略的计划简单的作业指示,表现不出作业间的从属关系。 A.直
根据《交通强国建设纲要》,到(),全面建成人民满意、保障有力、世界前列的
一额定电压为10kV的静电电容器,其容抗值为10.5Ω,接在6kV母线上,电容器
下列成本计划指标中,属于数量指标的有()。A.设计预算成本计划降低率 B
最新回复
(
0
)