In the early days of nuclear power, the United States made money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.
The greatest fear of nuclear power opponents has always been a reactor "meltdown". Today, the chances of a meltdown that would threaten U.S. public health are very little. But to even further reduce the possibility engineers are testing new reactors that rely not only on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But don’t expect them even on U.S. shores unless things change in Washington.
The procedure for licensing nuclear power plants is a bad dream.(9)Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice but- not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.
A case in point is the Shoreham plant on New York’s Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid 60s’. Millstone, complete for $101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $5 billion and delayed its use for many years.
Shoreham finally won its operation license. But the plant has never produced a watt power.
Questions 23 to 25 are based on the passage you have just heard.
23. How is the author’s attitude towards the development of nuclear power?
24. What has made the procedure for nuclear plants a bad dream?
25. What is Millstone in this passage?
选项
A、Negative.
B、Neutral.
C、Positive.
D、Questioning.
答案
C
解析
态度题。作者虽然没有明说他对于开发核能的态度,但从一些细节还是可以听出作者的态度的。如:“But don’t expect them even on U.S.shores unless things change in Washington.”“除非政府政策有所改变,否则别指望在美国建立核反应堆。”又如,“The procedure for licensing nuclear power plants is a bad dream.”可见,作者是觉得没有必要对开发核能这么谨慎。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2957733.html
相关试题推荐
[originaltext]Itisagreatprivilegeformetobeinvitedtospeakatthe
[originaltext]Kuwaitisacountrywhichisquitesmall,butwhichisveryr
[originaltext]Kuwaitisacountrywhichisquitesmall,butwhichisveryr
[originaltext]Thesumtotalofourknowledgeisverysmallcomparedtothe
[originaltext]Thesumtotalofourknowledgeisverysmallcomparedtothe
[originaltext]W:Hi,Ralf,howareyoudoing?M:Hi,Samantha,I’mfine,butI
[originaltext]W:Hi,Ralf,howareyoudoing?M:Hi,Samantha,I’mfine,butI
[originaltext]M:Hi,Janet.Youaresoluckytobedonewithyourfinalexamsa
[originaltext]W:Theredcarpetmatchesthefurniturewell’,doesn’tit?M:Bu
[originaltext]Massmediaaretoolsofcommunication.Massmediaallowusto
随机试题
堤防工程按()或工程结构划分单位工程。A.每座独立的建筑物 B.招标标段
鉴定这批鱼是否发生早期腐败的化学指标是()A.挥发性盐基总氮 B.三甲胺
Speakingtwolanguagesratherthanjust。
证券市场较为重要的结构有()。Ⅰ.层次结构Ⅱ.品种结构Ⅲ.交易场所结构Ⅳ.交易
变电站工程投运前1个月,运维单位应配备足够数量的仪器仪表、工器具、安全工器具、备
按风险存在的形态.可把风险划分为( )。 A.责任风险和信用风险 B
社会工作者小玲准备针对贫困地区女童失学问题提供相应服务,她的工作内容属于社会工作
(2017年真题)下列属于按照工艺专业化原则设置生产单位的优点的有()。A.缩
“哲学史宛如色彩斑斓的壁毯,其中唯物主义与唯心主义犹如浓粗的经线贯穿上下,而辩证
消除渠道差距的思路包括()。A.通过对市场进行细分,详细了解细分市场顾
最新回复
(
0
)