首页
登录
职称英语
[originaltext] It is barely half a century since parts of the Thames were de
[originaltext] It is barely half a century since parts of the Thames were de
游客
2023-08-17
20
管理
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £10 million open-air swimming pool in the middle of the Thames in Central London.
(12)Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.(13)Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
(14)The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic.(15)Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £300,000 to cover consultancy costs and other fees, which would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
Questions 12 to 15 are based on the passage you have just heard.
12. What can be learned about Germany?
13. What do people concern about the project?
14. What is the function of the glass partition?
15. Where is the money of the project likely to come from?
选项
A、It has the highest water cleanliness standard in Europe.
B、It has the best natural swimming pools in Europe.
C、It has the best purification specialists in Europe.
D、It has the cleanest rivers in Europe.
答案
A
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/2935254.html
相关试题推荐
[originaltext]M:Hi,Leslie!DidyougototheKentCentertovotelastweek?
[originaltext]M:Hi,Leslie!DidyougototheKentCentertovotelastweek?
[originaltext]Nowlistentothefollowingrecordingandanswerquestions23to
[originaltext]Nowlistentothefollowingrecordingandanswerquestions16to
[originaltext]Nowlistentothefollowingrecordingandanswerquestions16to
[originaltext]ItisbarelyhalfacenturysincepartsoftheThameswerede
[originaltext]ItisbarelyhalfacenturysincepartsoftheThameswerede
[originaltext]ItisbarelyhalfacenturysincepartsoftheThameswerede
[originaltext]Justwatchinganotherpersonshivercancauseourowntempera
[originaltext]Justwatchinganotherpersonshivercancauseourowntempera
随机试题
大跨度悬索桥的加劲梁主要用于承受()。A:桥面荷载 B:横向水平力 C:纵
病理性缩复环最可能见于以下哪种情况A.有子宫手术史的孕妇 B.子宫畸形 C.
A.阐述有关疾病的生物化学基础和疾病发生、发展过程中的生物化学变化B.疾病时组织
DIC最常见的病因是A.肿瘤性疾病 B.感染性疾病 C.广泛性手术 D.产
根据《关于进一步改革完善药品生产流通使用政策的若干意见》,国家将实行药品领域全链
下列有关优先股的说法中,不正确的有( )。A.相对于普通股股东,优先股股东享有
施工质量控制的系统过程可按不同的控制需要划分。需要根据工程实体质量形成的规律进行
一台星形联接的三相隐极同步发电机额定容量SN=1000kVA,额定电压UN=6.
“质量事故处理报告”应由()组织编写。A、项目经理B、项目总工程师C、监理工
据下表资料检验不同期矽肺患者的肺门密度级别构成是否相同,可用统计方法不同期次矽肺
最新回复
(
0
)