首页
登录
职称英语
[originaltext] It is barely half a century since parts of the Thames were de
[originaltext] It is barely half a century since parts of the Thames were de
游客
2023-08-16
47
管理
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £ 10 million open-air swinuning pool in the middle of the Thames in Central London.
(12)Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.(13)Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
(14)The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic.(15)Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £300,000 to cover consultancy costs and other fees would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
Questions 12 to 15 are based on the passage you have just heard.
12. What can we learn about Germany?
13. What do people concern about the project?
14. What is the function of the glass partition?
15. Where is the initial money of the project likely to come from?
选项
A、To separate the changing rooms from the pool.
B、To provide a path to the swimming area.
C、To make the pool shallow enough for children.
D、To protect people from waves caused by river traffic.
答案
D
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/2929811.html
相关试题推荐
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Currentstudiesshowthatwhatgoesonlabelsisanimportant
[originaltext]Currentstudiesshowthatwhatgoesonlabelsisanimportant
[originaltext]I’msureyourealizethatyourresearchpapersaredueinsix
[originaltext]M:Goodmorning,Dr.Smith.MynameisPeter.Iamafreshmanin
随机试题
HowtoReadEffectivelyManystudentstendtoreadbookswithou
Didyouknowthatataskthat’sinterrupted(1)_____50%longerandhas50%
[originaltext]W:Hello.Whendidyougetback?M:Um,thismorning.Around6o’
[originaltext]M:Lisa,Lisa!Overhere,darlingIIt’swonderfultoseeyou.Oh
I________________astripofredpaperroundtheneckofthevasetodistinguis
普通股股东在股份公司解散清算时,有权要求取得公司的()。A.银行存款 B.注册
(2020年真题)对证券公司投资银行类项目负有主要管理或执行责任人员的收入支付年
一个国家(或地区)所有常住单位在一定时期内生产活动的最终成果是( )。A.国内生
除外哪项,其他均为常见的注意障碍A.注意转移 B.注意涣散 C.注意增强
关于施工项目经理的说法,正确的是()。A.项目经理是施工企业法定代表人 B.项
最新回复
(
0
)