首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
67
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 6, Para. 3)means______.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
含义题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings.可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2813190.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Leaddeposits,whichaccumulatedinsoilandsnowduringthe1960’smid7O’s,
Whichofthefollowingdeterminers(限定词)canbeplacedbeforebothsingularcounta
______isthecapitalcityofNewZealand.A、WellingtonB、VancouverC、AucklandD、
Shipscantransport(many)______goodsthanothermeansoftransportation.more本
[originaltext]M:Ifitdoesnotrain,let’sgooutforawalkthisevening.W:
[originaltext]M:Hey,wheredidyoufindthejournal?Ineedittoo.W:Righth
大连接体的作用有()A.A,B,C,D B.稳定作用 C.支持作
注射用安瓿的处理工艺应是A:灌水蒸煮→洗涤→切割→圆口→灭菌B:圆口→切割→灌
(2019年真题)投标人编制分部分项工程综合单价的主要工作有:①计算清单项目的管
依据《生产安全事故应急预案管理办法》,生产经营单位应急预案应根据不同情况变化及时
最新回复
(
0
)