首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
52
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The central idea of the passage is to point out potential problems regarding______.
选项
A、effects of high-level radiation
B、operation of nuclear power plants
C、fallout from the explosion of unclear weapons
D、various sources of radioactive wastes
答案
D
解析
主旨题。作者在短文第一句就指出了主题:The most pressing nuclear energy issue is the disposal of nuclear waste.关键词是“核废料”nuclear waste。故选项D正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2811849.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
78:S={1,3,5,7,…,397,399}SetSconsistsoftheoddnumbersfrom1to399,inc
Itisacommonplaceamongmoraliststhatyoucannotgethappinessbypursuin
[originaltext]M:WhereisLilygoing?Isshegoingonadate?W:(1)Lilyiseigh
Livingnearairportsmightnotonlyleadtoresidentssufferingsleeplessni
Unlikeso-calledbasicemotionssuchas
对局部发生水疱和糜烂者可涂敷()。A:10%氧化锌软膏 B:10%樟脑软膏
以下哪项是麦门冬汤的功用A化痰散饮,和胃降逆 B滋养肺肾,止咳化痰 C益气滋
用十二指肠引流可诊断以下哪种寄生虫及阶段A.蓝氏贾第鞭毛虫包囊B.蓝氏贾第鞭毛虫
A.0.02 B.0.04 C.0.4 D.4
水利枢纽某拟建水利枢纽工程为坝后式开发,工程以防洪为主,兼顾供水和发电。水库具有
最新回复
(
0
)