首页
登录
职称英语
[originaltext] The water clock was an ancient clock. It could be used on clo
[originaltext] The water clock was an ancient clock. It could be used on clo
游客
2023-06-29
58
管理
问题
The water clock was an ancient clock. It could be used on cloudy days, at night, and indoors. Such clocks were probably first used in Egypt [16]about 2,000 B.C. They were also used for many years in Arabia, India, China, and all of Europe.
The simplest water clock needed just two parts—a small bowl and a large bowl. The small bowl had a tiny hole in the bottom; the large bowl was divided into equal parts, and marked by lines. [17]Water was poured into the small bowl, and it fell slowly down into the large bowl in tiny drops. Usually it took an hour for the water to rise from one line to the next in the large bowl.
A beautiful water clock was made in Persia over a thousand years ago. It was presented as a gift to the Emperor of France. This water clock could be heard as well as seen. The dial of the clock was made up of twelve doors, each representing an hour. [18]Every hour a door opened, and the proper number of metal balls dropped onto a thin brass plate to strike the hour. At twelve o’clock, twelve tiny horsemen came out and shut all the doors. This was probably one of the first striking clocks.
16. When was the first water clock probably made?
17. What do we know about the structure of the simplest water clock?
18. What did the striking water clock use to strike hours?
选项
A、About 4,000 years ago.
B、About 3,000 years ago.
C、About 2,000 years ago.
D、About 1,000 years ago.
答案
A
解析
录音只提到一个年代,即“2,000 B.C.”,听到这个数字即可选出正确答案A(距今约4000年)。选项C(2000年以前)故意漏掉B.C.;而选项B(3000年以前)和D(1000年以前)是和文章完全不相关的数字,可排除。
转载请注明原文地址:https://www.tihaiku.com/zcyy/2792788.html
相关试题推荐
[originaltext]M:[13]It’sChineseNewYear’sEvetonight.Let’sgoandwatcha
[originaltext]M:[13]It’sChineseNewYear’sEvetonight.Let’sgoandwatcha
[originaltext]W:Goodafternoon.CanIhelpyou?M:Yesplease.I’mlookingfo
[originaltext]W:Goodafternoon.CanIhelpyou?M:Yesplease.I’mlookingfo
[originaltext]M:Canyoutellmethetitleofthisoilpainting?W:Sorry,Id
[originaltext]M:Canyoutellmethetitleofthisoilpainting?W:Sorry,Id
[originaltext]M:Canyoutellmethetitleofthisoilpainting?W:Sorry,Id
[originaltext]M:Canyoutellmethetitleofthisoilpainting?W:Sorry,Id
[originaltext]ColumbussailedfromSpaininSeptember1492,lookingforgold.N
[originaltext]ColumbussailedfromSpaininSeptember1492,lookingforgold.N
随机试题
Whatdidthespeakerdecidetodoafterlunchthatday?[br][originaltext]H
Thereisnodenyingthatstudentsshouldlearnsomethingabouthowcomputers
CrippledbyComputers
在双代号时标网络计划中,总时差的判读方法为( )。A.以网络计划终点节点为完成
某大型系统集成项目进行公开招标,要求投标人具有计算机系统集成二级资质,甲、乙两家
水泥安定性试验有争议时,应以()为准。A.试饼法 B.雷氏夹法 C.沸
足太阴脾经在胸部的循行为旁开前正中线A.0.5寸B.1.5寸C.2寸D.4寸E.
麻黄制绒的作用是A.降低毒性B.缓和药性C.消除副作用D.洁净药物E.矫臭矫味
共用题干 第三篇GrossNationalHappinessInthe
下列关于岗位设计的方法研究技术的表述,正确的是()。A.流线图记录了生产工艺加
最新回复
(
0
)