首页
登录
职称英语
共用题干 第三篇Human Space ExplorationWhile sc
共用题干 第三篇Human Space ExplorationWhile sc
免费题库
2022-08-02
9
问题
共用题干第三篇
Human Space Exploration
While scientists are searching the cause of the Columbia disaster,NASA is moving
ahead with plans to develop a new craft that would replace shuttles(航天飞机)on space
station missions by 2012 and respond quickly to space station emergencies.
The space agency released the first set of mission needs and requirements several days
ago for the orbital space plane(轨道航天飞机),which would be designed to transport a
crew of four to and from the International Space Station.
Although it includes few specifics, the plan states the orbiter(轨道航天飞机)will be
safer,cheaper and require less preparation time than the shuttle.It would be able to
transport four crew members by 2012一though it would be available for rescue missions by
2010.NASA says the craft should be able to transport injured or ill space station crew
members to "definitive(决定性的)medical care" within 24 hours.
The release of the requirements showed NASA remains focused on the long-term
priorities of space exploration,even as questions exist concerning the loss of Columbia and
its seven-member crew on February 1,2003.
Experts at Marshall Space Flight Center in Huntsville,Alabama,have been working for
years on a successor to the shuttle.The project,known as the Space Launch Initiative(倡
议),was divided last year into two parts一one focusing on a future launch vehicle,the
other on a space station orbiter. The orbiter is expected to be ready sooner.
The program's managers say NASA officials have told them not to alter Space
Launch Initiative in light of the Columbia disaster.
U.S. President George W. Bush asked Congress for about U.S.$1 billion for Space
Launch Initiative in 2004,funds that would be almost equally split between the Orbital Space
Plane and Next Generation Launch Technology.Besides its main mission,the orbiter would also be used asA:a medical research center. B:a space station.C:a space ambulance. D:a passenger plane.
选项
Besides its main mission,the orbiter would also be used as
A:a medical research center.
B:a space station.
C:a space ambulance.
D:a passenger plane.
答案
C
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/1493505.html
本试题收录于:
理工C题库理工类分类
理工C
理工类
相关试题推荐
共用题干 第三篇TryingtoFindaPartnerOneof
共用题干 第三篇TryingtoFindaPartnerOneof
共用题干 第一篇ASocietyWithoutaFormalAuth
共用题干 第一篇ASocietyWithoutaFormalAuth
共用题干 Earthquake1.Everyyearearthquakes
共用题干 Earthquake1.Everyyearearthquakes
共用题干 Earthquake1.Everyyearearthquakes
共用题干 Earthquake1.Everyyearearthquakes
共用题干 CreatingaWorldwithoutSmokingSm
共用题干 CreatingaWorldwithoutSmokingSm
随机试题
[originaltext]Forshopaholics,thepost-Christmasperiodmeansonlyonethi
Accordingtothenews,therelationshipbetweenU.SandIranhadbeenhostilefo
某工程双代号时标网络计划如下图所示,其中工作E的自由时差为()。 A:0
对于腹痛的临床表现下列各项均恰当,但除外A.改变体位可使腹痛减轻或加剧 B.慢
下列传染病中不须实行甲类传染病预防、控制措施的是A.传染性非典型肺炎 B.肺炭
对于急性炎症性脱髓鞘性多发性神经病的患者,检查结果常有血清免疫球蛋白显著增高,其
可引起血尿的疾病不包括A.结缔组织病B.肾小球肾炎C.泌尿系统肿瘤D.泌尿系统感
可用于制备透皮给药系统的药物熔点范围为A.40℃以下B.40~60℃C.85℃以
D
下列建设工程生产安全事故应急预案的具体内容中,属于综合预案编制内容的有()。A
最新回复
(
0
)