Central Engineering Company
Board of Directors Meeting
Wednesday, November 15, 20 8:30 A.M.-11:30 A.M.
Place: Suite 10
AGENDA
1. Hiring challenges Jorgen Spelman
2. Management changes Narelle Dundee
3. Financial report Madeira Jones
4. Technology upgrades Jerry Carver
FAX COVER SHEET
CENTRAL ENGINEERING COMPANY
294 Green Street
Brasilia
Brazil
Tel: (55) 61 3420 4015
Fax: (55) 61 3420 4017
To: Ruben Baker
From: Narelle Dundee
Date: November 15, 20
Pages: 1
Ref: Results of the board meeting
Message:
I hope your business trip is going well. Today’s meeting went well for the most part, even though it began 30 minutes late. Jorgen wasn’t there at the beginning, so I used his time slot to give my report. Jorgen finally arrived at 9:30 and gave his report. The board members were surprised to hear that job applicants complain about our salary offers. Jerry’s report really shocked and upset the board. Fortunately, Madeira’s report had the opposite effect. Everyone was happy to hear about our great profits.
The technology upgrades report didn’t go so well. Jerry had to leave the meeting before his report because there was an Internet problem in the Electrical Engineering department. Because of this, the presenter for our third agenda item read Jerry’s report, and it was a bit confusing. She didn’t really know what she was talking about and couldn’t answer questions satisfactorily. We decided to ask Jerry to provide written answers to questions raised by board members during the meeting.
Because we started late, we finished a half hour late, but we still had to hurry to finish within the allotted time. We decided to make the next board meeting a half-hour longer to give more time for discussion and questions. [br] What was the topic of the first report given?
选项
A、Hiring challenges
B、Management changes
C、Finances
D、Technology
答案
B
解析
Narelle Dundee, the writer of the fax, spoke first about her topic, management changes, because Jorgen Spelman arrived late. Choice (A) is the topic that was originally scheduled to be presented first. Choices (C) and (D) are topics that were presented later.
转载请注明原文地址:https://www.tihaiku.com/zcyy/4124574.html
相关试题推荐
Themergercontractwilltakeeffect_______afterthetwoCEOsfromeachcompany
Shedeclinedtoconfirmreportsthatthecentralbankwasconsidering_______the
AERONAUTICSYSTEMS,INC.,theBerlin-basedcompanyalsoknownasAeroSys,has
AERONAUTICSYSTEMS,INC.,theBerlin-basedcompanyalsoknownasAeroSys,has
AERONAUTICSYSTEMS,INC.,theBerlin-basedcompanyalsoknownasAeroSys,has
Thecompanyappreciatesnotonlythepresident’sambition______hisideas.A、orB
Ourcompany______MetroMessengerServicesince1998.A、useB、usedC、hadusedD、
Thecompanyoffersa______planforitsworkers.A、retirementB、retiringC、retire
CentralEngineeringCompanyBoardofDirectorsMee
CentralEngineeringCompanyBoardofDirectorsMee
随机试题
Saridonisacombinationofanalgesic(止痛的)andantipyretic(退热的)substances.
WhattoDowithYourHand
以下关于DHCP的说法错误的是()。 A.DHCP服务端使用UDP的67端口
在诊断上内镜应用最广的是()A.呼吸系统 B.循环系统 C.消化系统
Whichisthebranchoflinguisticswhich
按规定,在保修期限和保修范围内,甲建筑工程公司对用户进行回访的方式有()
采购信息技术主要包括( )。A.计算机网络系统 B.Internet网络
当采用分相操动机构的断路器,并设有综合重合闸或单相重合闸装置时,断路器控制接线下
根据《标准施工招标文件》工程变更的情形有()。A.改变合同中某项工作的质量
某建筑项目位于城市市区内,按照《环境噪声污染防治法》要求,施工中向周围生活环境排