首页
登录
职称英语
Between what times is the road traffic lightest? [br] What will be the extra cos
Between what times is the road traffic lightest? [br] What will be the extra cos
游客
2025-02-14
10
管理
问题
Between what times is the road traffic lightest? [br] What will be the extra cost of modifying houses?
Good afternoon. I’m Paula Bundell and I am giving you the lectures on Environmental
Noise this term. Today we are going to look into the effects of noise on a planned housing
estate in a particularly difficult part of the new Manchester Park area.
This site is not as bad as some I have researched in the past. The Blacktown airport is
closed from 6pm to 7am and this is a great advantage to the site. The only noise after dark
is from the highway and the traffic is somewhat reduced between 7.30pm and 5.30am. 【Q31】
So, the people most affected by the noise will be, I expect, housewives. By the time most of 【Q32】
the students and workers have arrived back home in the evening during the week the noise
will have abated to a fairly large extent. The weekends are still a problem of course, but the
traffic is certainly reduced on Saturdays to a large extent and even more so on Sundays. 【Q33】
Of course modifications to houses will be necessary at a site like this and they come at a
significant cost to the developer and home buyer. The modifications I am about to outline
will add about $25,000 to the price of a newly-built house. That will still mean a cheaper 【Q34】
house than in a less noisy and more desirable area.
A bit of background would not go astray. I understand that you are all familiar with the
proposed development site at Manchester Park.
It’s a particularly difficult one in terms of noise with the highway along the eastern
perimeter and the Blacktown airport not 3 kilometres away to the north.
Of course, those nearest the highway will be the worst hit, with heavy traffic noise as
well as the noise from the light planes overhead. As you all know, the normal noise
threshold for private housing is 55 decibels. At this site the levels have been recorded as 【Q35】
high as 67 decibels.
The construction of the houses has to be somewhat modified from houses in most areas. In
the houses on the highway and in the noisiest areas of this site there will be a need for
specialised double glazing and special acoustic seals will have to be fitted to the doors. 【Example】
All exterior doors in this especially noisy pocket will have to be solid core wood doors with
hinges. Every house built on this site, not just those adjacent to the highway or nearest to
the airport, will require high density insulation materials in the roof. Not only will all the
roofs need insulating, the exterior walls will be required to be double brick. All ceilings will 【Q36】
require double thickness plaster board to be used in the construction. In the noisiest areas
mechanical ventilation will have to be installed in the exterior walls. In those areas with 【Q37】
sealed windows it will be necessary to fit fans with absorbers to cut out the noise in those
particular houses. Air conditioning units could also be fitted in the ceilings of such houses 【Q38】
but this is substantially more expensive than fans, and may not be needed on this site.
Coming back now to the double glazing I mentioned before. Specialised double glazing
requires a larger air gap between the inner and outer glass than normal double glazing.
The gap must be at least 7 centimetres. The thickness of the glass is also a factor, 8 【Q39】
millimetres on the outside and 6 on the inside pane. It is essential that the glass be thicker
on the outside than on the inside and that the gap between the panes of glass be a
minimum of 7 centimetres.
Obviously, the noise factor will have to be taken into consideration with the layout of
the houses. Living areas will have to be designed at the back of the houses away from the
highway. Bedrooms and living rooms will have to be built towards the back, and for those 【Q40】
houses closest to the highway two layers of plasterboard will be needed for the interior
bedroom walls. Those rooms constructed at the front of the houses should be garages,
laundries, kitchens, bathrooms and dining rooms.
I have come to the conclusion that this development should go ahead, but with various
acoustic modifications according to the position of the block in relation to the highway
and intersection.
选项
答案
(about) $25,000/twenty-five thousand dollars 【NOT 25,000】
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3956484.html
相关试题推荐
Thewidelydocumented(i)______betweenthesetwodiseaseshaspromptedscientist
Effortsarefinallybeingmadeto______thetrafficcongestionthatplaguesthed
Becauseshehadmistakenlyassumedthatthedisputesbetweenthepartiescouldb
Theborderbetweenthetwoproperties,never(i)______bylegalmeans,hadlongb
Biologistshavelittle(i)______drawingthelinkbetweenthesuccessofhumanit
Adividebetweenaestheticandtechnicalconsiderationshasplayedacrucialrol
Since1813reactiontoJaneAusten’snovelshasoscillatedbetween(i)________a
Thestateisanetworkofexchangedbenefitsandbeliefs,(i)____betweenrulers
Despiteassortedeffusionstothecontrary,thereisnonecessarylinkbetweens
Superficialdifferencesbetweenthespecialproblemsandtechniquesofthephysi
随机试题
直到昨天下午他们才讨论了我的建议。Theydidn’tdiscussmysuggestionuntilyesterdayafternoon.
[originaltext]M:Hi.WelcometoHeavenlyPies.MayItakeyourorder?W:Uh...
设图所示结构建造时温度为t,使用时外部温度降为﹣t,内部温度仍为t,则为减少温度
数字签名首先要生成消息摘要,采用的算法为( ),摘要长度为( )位。 问题
下列关于邀请招标的特点的说法中,不正确的是()。A、应当向3个以上的具备承担
张某申请商业性个人住房贷款100万元,贷款年利率为5%,贷款期限为15年,采用按
长期停运超过()的断路器,应经常规试验合格方可投运。在正式执行操作前应通
社会主义本质中的生产力方面的目标是 A.消灭剥削 B.消除两极分化 C.最
在国外工程咨询公司的服务内容中,除了()之外,其余各阶段工作业主都可能单独委托工
基坑开挖过程中,一旦出现渗水或漏水,应及时采取的措施是( )。A.坑底加固
最新回复
(
0
)