首页
登录
职称英语
Why does the summit of the Sydney Harbour Bridge increase? [br] [originaltext]W
Why does the summit of the Sydney Harbour Bridge increase? [br] [originaltext]W
游客
2024-08-15
31
管理
问题
Why does the summit of the Sydney Harbour Bridge increase? [br]
W Well, good morning again, everyone, and welcome to "Perspectives" , the weekly New South Wales Radio programme on subjects of general interest from our local area. Today I have in the studio Mr. George Symonds. Good morning, George.
M Good morning, Anne.
W So, what are you going to talk to us about today, George?
M Well, for people from New South Wales and particularly Sydney, this will be of great interest—I hope. I’ m going to tell you a little about Sydney Harbour Bridge.
W Wow! That’ll be so interesting,
M I think so. To start with, I’d like to tell you a little about the size of the bridge. The arch span is 503 metres and the weight of the steel arch is 39,000 tons, (11)The summit is 134m above mean sea level, though it can actually increase by as much as 18cm on hot days as the result of steel expanding in heat. The two pairs of pylons at each end are about 89 metres high and are made of concrete and granite. The steel used for the bridge was largely imported. About 79% came from the United Kingdom but the rest was Australian-made. The granite was quarried in Moroya down the coast, and the concrete is also Australian.
W So, most of the steel used to make our great bridge actually came from England?
M Yes, I’m afraid so. (12)However, the workforce were all Australian!
W Thank God for that. When was the bridge actually built?
M (13)The bridge was opened in 1932 but work first began in 1924, with the construction of the bridge approaches and spans, with two separate teams building the arch on each side working towards each other. The arch was successfully joined on August 19, 1930. I’m afraid that working practices weren’ t very fair in those days and the local government demolished 438 homes which were in the way of the approaches, and as many as 800 families living there were displaced without compensation. The standards of industrial safety were inadequate too. (14)16 workers died during its construction, mainly from falling off the bridge.
W I didn’ t realise that.
M It’ s true. The bridge was formally opened on the 19th March, 1932 by the Premier of New South Wales, Mr. Jack Lang. When it was opened, it was the longest single span steel arch bridge in the world and one of the greatest engineering masterpieces of its time. (15)Several songs were also composed in advance for the occasion but these have now been largely lost or forgotten. However, three postage stamps were issued to commemorate the opening of the bridge and these still exist. One of these stamps, with a face value of five shillings, is now worth several hundred dollars.
选项
A、A long poem.
B、A delicate brochure.
C、Several songs.
D、Three sets of stamps.
答案
C
解析
为庆祝大桥的落成,人们谱写了几首歌曲,还为此发行了纪念邮票。但是题干要求的是提前做出的庆祝准备。故选C。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3720884.html
相关试题推荐
WhatdoesLizMcCartneythinkofherwinningtheprize?[br][originaltext]Ande
WhatdoesLizMcCartneythinkofherwinningtheprize?[br][originaltext]Ande
WhatdoesLizMcCartneythinkofherwinningtheprize?[originaltext]Anderson(A
WhatistheaccidenthappeninginRegentStreet?[br][originaltext]W:Here’st
WhatistheaccidenthappeninginRegentStreet?[br][originaltext]W:Here’st
WhatistheaccidenthappeninginRegentStreet?[br][originaltext]W:Here’st
HowlongdidAlbertstaywiththehorsehenamedJoey?[br][originaltext]Alan:
HowlongdidAlbertstaywiththehorsehenamedJoey?[br][originaltext]Alan:
HowlongisKarenplanningtotravel?[br][originaltext]M:Whenareyouoffto
HowlongisKarenplanningtotravel?[br][originaltext]M:Whenareyouoffto
随机试题
[img]2014m4s/ct_epekm_epelist_0317_201421[/img][br][originaltext]Canyoudriv
[originaltext]Whatareyoumajoringin?[/originaltext]A、Inacollege.B、Notver
同条件养护试块评定结构实体混凝土强度,可乘1.1折算系数,检测单位仍按实际强度出
慢性肾衰病人水肿明显,在每次透析时可进行透析脱水,脱水量可超过病人体重增加量的A
根据《房屋建筑与装饰工程工程量清单计价规范》GB50584-2013,关于实心砖
患者,女,12岁,恒牙,基本中性,上前牙Ⅲ拥挤,上颌与下颌反、间隙不足,下切牙Ⅰ
A.连接酶 B.端粒酶 C.反转录酶 D.末端转移酶 E.拓扑异构酶以R
上海某大学为加强学术交流,于2007年5月邀请德国一学术代表团讲学,将从武汉口岸
根据《堤防工程施工规范》(SL260-2014),填筑堤防横断面上的地面坡度较陡
重症急性胰腺炎患者出现血压下降,给予快速补液后,患者可出现的临床表现是( )。
最新回复
(
0
)