首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-06-14
48
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969.This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-eight years ago?
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3633267.html
相关试题推荐
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]M:Howdidyoulikethefireworkslastnight?W:Ireallydidn’t
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:WhatcanIdoforyou?M:Yes,Iwouldlikesometicketsforn
[originaltext]M:MayIhelpyou?W:Yes,myfriendisfinishingmiddlehighsch
[originaltext]W:Gotobedearlyandgetsomerest,Jack.M:ButIhavetostu
随机试题
WhichofthefollowingisNOTthecharacteristicofconversationalimplicature?A
[originaltext]M:Thesummerholidayiscoming,butIreallydon’tknowwhatto
与内部招聘相比,外部招聘的优点主要有()。A.有利于企业扩展视野 B.可以
()是负责制定企业的信息化政策和标准,实施组织信息系统规划,并对企业的信息
某植物油加工厂生产采用的是油脂浸出工艺,以先进的化工萃取法提取大豆油脂,生产工具
苦杏仁治疗的病证是A.既能够治疗肠燥便秘,又能够治疗胸痹、结胸 B.既能够
各种运输方式内外部的各个方面的构成和联系,就是( )。 A.运输系统
关于劳动力市场的说法,正确的有()。A.在劳动力市场上有很多机构为劳动力供求双
天馈线系统测试时,如驻波比太高,直接影响基站的()。A.语音质量 B.系
施工组织设计中施工方案的内容包括()。A.工程概况 B.施工平面布置图设计
最新回复
(
0
)