首页
登录
职称英语
The Environmental Protection Agency has set limits for the radiation permitt
The Environmental Protection Agency has set limits for the radiation permitt
游客
2024-06-06
60
管理
问题
The Environmental Protection Agency has set limits for the radiation permitted to
leak from a proposed nuclear waste burial center in the state of Nevada. The action will
help decided whether the federal government can build the nuclear waste dump at 【S1】______
Yucca Mountain.
The dump would be used to bury about seventy-thousand tons of nuclear waste.
The waste includes use nuclear fuel from power 【S2】______
centers and waste flora the production of nuclear weapons. The waste is now stored at 【S3】______
power center around the country.
Yucca Mountain is owned by the federal government No one lives there. It is in a 【S4】______
extremely dry area more than one-hundred-forty-five kilometers northwest of Las Vegas.
The administration of President Bush behaves a nuclear
waste Dump should develop there. It says this dump is needed to 【S5】______
permit an decrease in nuclear power centers. Federal officials 【S6】______
supports more use of nuclear power because of the nation’s energy problems. But 【S7】______
Nevada state officials strongly approve the plan. The dispute about Yucca Mountain 【S8】______
has continued for almost twenty years.
The Environmental Protection Agency recently establish radiation limits for 【S9】______
groundwater, air and soil near Yucca Mountain. Both sides claimed that the agency
ruling helped their cause. Department of Energy Secretary Spencer Abraham says his
agency can meet the new requirement. Mister Abraham says the government may 【S10】______
continue with the project by the end of the year. [br] 【S7】
选项
答案
supports改为support
解析
因为前面是复数名词“officials”。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3621648.html
相关试题推荐
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermit
Airpollutionisoneofthemostpervasiveenvironmentalproblemsbecauseatm
Airpollutionisoneofthemostpervasiveenvironmentalproblemsbecauseatm
Airpollutionisoneofthemostpervasiveenvironmentalproblemsbecauseatm
Airpollutionisoneofthemostpervasiveenvironmentalproblemsbecauseatm
随机试题
ReadthefollowingpassagecarefullyandthenwriteasummaryofitinEnglishi
Themusicarousedan______feelingofhomesicknessinhim.A、intentionalB、intermi
Cellphonesprovideinstantaccesstopeople.Theyarecreatingamajor【C1】_
[originaltext]M:Arthur’sfarewelldinneristhisweekend.W:WishIcouldtake
某房产开发商拟在石油化工厂附近开发建设一个居住区,石油化工厂设有总容积为1000
健康风险评估的基本原理中,下列()不是健康风险评估的基本模块。A.问卷 B
糖皮质激素与抗生素合用治疗严重感染的目的是()A.增强抗生素的抗菌作用 B
__________是形成各种技能所不可缺少的关键环节。
根据票据法律制度的规定,下列关于票据转让背书无效情形的表述中,正确的是()
2019年2月1日甲公司以2800万元购入一项专门用于生产H设备的专利技术。该专
最新回复
(
0
)