首页
登录
职称英语
[originaltext] (33)London has become a cycle friendly zone after the launch
[originaltext] (33)London has become a cycle friendly zone after the launch
游客
2024-05-16
54
管理
问题
(33)London has become a cycle friendly zone after the launch of a new bike hire scheme, which has been designed to encourage more people to cycle in and around central London. So how does it work? First you have to sign up to the scheme to get a key to unlock one of the bikes, which are kept at docking stations (中转站) in and around central London. (34) You have to pay an access fee for the key and then you pay as you go, for the length of time you use the bike. Transport for London, which runs the scheme, are hoping to have 6 000 bikes and 400 docking stations in place by the end of the year. It is hoping to ease congestion in London and is expected to generate up to 40 000 extra cycle trips a day into the city centre. London Mayor Boris Johnston launched the scheme and said London had been "filled with thousands of gleaming machines that will transform the look and feel of our streets and become as commonplace on our roads as black cabs and red buses." However, there have been a few glitches (小故障) since the scheme was launched last Friday. On the first day some people found they couldn’t dock their bike properly and their usage of the bike had not registered. (35)Transport for London did admit they had been expecting a few "teething problems" and have said they would abandon the charges for the first day as a "gesture of goodwill." Some other people have criticized the lack of docking stations and locks for the bikes as well as the price it costs to hire the bicycles.
33. According to the study, what is the aim of the bike hire scheme?
34. How does the scheme work according to the passage?
35. What will Transport for London do with the charges for the first day?
选项
A、To encourage bicycling in and around central London.
B、To make full use of the docking stations in London.
C、To build an environmentally friendly city.
D、To solve the problem of traffic congestion.
答案
A
解析
事实细节题。短文开头便指出,伦敦启动了自行车租赁计划,以鼓励更多的人骑自行车出行。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3601147.html
相关试题推荐
[originaltext]M:Idon’tunderstandit.(19)IgotanoticefromthebankthatI
[originaltext]M:Idon’tunderstandit.(19)IgotanoticefromthebankthatI
[originaltext](33)Londonhasbecomeacyclefriendlyzoneafterthelaunch
[originaltext]Manysaytheirbraindoesn’tstartworkingproperlyinthemo
[originaltext]W:Goodmorning,BrendaPeters.Youwillbewelcomingthenewmem
[originaltext]W:Goodmorning,BrendaPeters.Youwillbewelcomingthenewmem
[originaltext]W:Goodmorning,BrendaPeters.Youwillbewelcomingthenewmem
[originaltext]W:IheardthatyouappearedontheSixO’clockNews.M:Oh,som
[originaltext]W:IheardthatyouappearedontheSixO’clockNews.M:Oh,som
[originaltext]W:IheardthatyouappearedontheSixO’clockNews.M:Oh,som
随机试题
Whatdoesthewomanmean?[br][originaltext]M:DoyoumindifIsmokehere?W:
[originaltext]It’snosecretthatthroughouthistorycommonstockhasoutp
ThomasMalthuspublishedhisEssayonthePrincipleofPopulationalmost200
患者,女,38岁,左上25缺失,近远中间隙可,咬合正常。左上134牙体、牙周组织
新生儿肝炎和先天性胆道闭锁的主要鉴别点为A.大便颜色 B.胆红素的动态变化
决定测绘项目设备资源配置方案的主要因素不包括( )。A.测区状况 B.作业方
同一类传染病病人住同一病房,床距应保持在A:1m以上 B:0.8m以上 C:
建设管理单位(部门)提前(____)月将验收计划提交运检部,运检部审核工程是否具
进入银行业金融机构进行现场检查,应当经银行业监督管理机构负责人批准,且检查人员不
某水利工程一单项工作直接工程费与间接费之和为300元,根据《水利工程设计概(估)
最新回复
(
0
)