首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-05-14
73
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、To drive the train after it is started automatically.
B、To start the train and to drive it when necessary.
C、To take care of the passengers on the train.
D、To send commanding signals to the command spot.
答案
B
解析
What is the task of the ore worker on the Victoria Line train?
转载请注明原文地址:https://www.tihaiku.com/zcyy/3598012.html
相关试题推荐
[originaltext]Pullingheavysuitcasesalldayinthesummerishardwork,e
[originaltext]Pullingheavysuitcasesalldayinthesummerishardwork,e
[originaltext]DuringWorldWarII,GreatBritainandtheUnitedStatestrie
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]W:Whatdidyouthinkofthemovie?Didyoulikeit?M:Notreall
[originaltext]W:Whatdidyouthinkofthemovie?Didyoulikeit?M:Notreall
[originaltext]W:Iwasworkingonapaperaboutthedifferencesbetweenwomena
[originaltext]W:Iwasworkingonapaperaboutthedifferencesbetweenwomena
[originaltext]M:Don’tyouthinkoursonshouldgointomedicine?Healwaysfee
随机试题
Theroleofandtreatmentofthehousewife,whichisreallythemajorboneof
TheAmericaneducationsystemrequiresthatstudentscomplete12yearsofpr
[originaltext]Amassiveevacuationoftouristsinoneoftheworld’slargest
ShoppingandtheInternet,MakingItClickA)TerryLundgrenandKevinR
通常电压数值稳定不变的生物电是()。A.动作电位 B.峰电位 C.局部电位
下列关于中小非金融企业集合票据的表述中,错误的是( )。A.任一企业集合票据待
一高层建筑建筑高80m,该建筑消防车登高操作场地的长度不得小于()m。A.5
A.由县以上人民政府卫生行政部门吊销其执业证书 B.由县以上人民政府卫生行政部
薪酬的决策集中度比较高,这是与()匹配的人力资源战略薪酬职能的表现。A.内部成
工序是人、材料、机械设备、施工方法和环境因素对工程质量综合起作用的过程,所以对施
最新回复
(
0
)