首页
登录
职称英语
As the plane circled over the airport, everyone sensed that something was wrong.
As the plane circled over the airport, everyone sensed that something was wrong.
游客
2024-03-02
6
管理
问题
As the plane circled over the airport, everyone sensed that something was wrong. The plane was moving unsteadily through the air, and【S1】______the passengers had fastened their seat belts, they were suddenly【S2】______forward. At that moment, the airhostess【S3】______. She looked very pale, but was quite【S4】______. Speaking quickly but almost in a whisper, she【S5】______everyone that the pilot had【S6】______and asked if any of the passengers knew anything about machines or at【S7】______how to drive a car. After a moment【S8】______, a man got up and followed the hostess into the pilot’s cabin. Moving the pilot【S9】______, the man took his seat and listened carefully to the【S10】______instructions that were being sent by radio from the airport below. The plane was now dangerously close to ground, but to everyone’s relief, it soon began to climb.
A although B anxious C thrown D shifted
E appeared F urgent G presented H aside
I even J informed K calm L least
M fainted N length O hesitation [br] 【S10】
选项
答案
P
解析
本句意为:这个人坐到飞行员的座位上,认真听来自下面机场通过无线电发出的紧急指令。anxious焦急的不符合句意。只有urgent合适。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3498886.html
相关试题推荐
[originaltext]Todaywhenamanstepsontothemoon,orsomethingnewandi
[originaltext]Todaywhenamanstepsontothemoon,orsomethingnewandi
【B1】[br]【B8】A、somethingB、anythingC、nothingD、thingC文中这句话的含义是“许多酒馆从点心到套餐,包括酒
[originaltext]Todaywhenamanstepsontothemoon,orsomethingnewandim
【B1】[br]【B8】A、stimulusB、judgmentC、senseD、intelligenceC名词辨义题[考频:38]。这句的意思是“
【S1】[br]【S9】Cling→clingingavoiddoingsomething搭配。
[originaltext]M:Isthatamap?Areyougoingsailingorsomething?W:Iwish.
[originaltext]M:Isthatamap?Areyougoingsailingorsomething?W:Iwish.
[originaltext]Todaywhenamanstepsontothemoon,orsomethingnewandi
It’stime______(采取措施)aboutthetrafficproblemdowntown.somethingwasdone/so
随机试题
ThefloodofwomenintothejobmarketboostedeconomicgrowthandchangedU
建设项目全生命期一体化管理(PLIM)模式是指由业主单位牵头,()全面负责,从各
(2018年)小奥公司2017年12月1日购入甲股票,并指定为以公允价值计量且其
衡量社会生产力发展水平的主要标志是( )A.劳动资料 B.劳动对象 C.生
下列关于妄想的说法,正确的是A.在意识中占主导地位的错误观念 B.不接受事实,
患儿,男,11岁。形体消瘦,3年来经常挤眉眨眼,耸肩摇头,有时肢体震颤并口出秽语
关于工程质量特点的说法,正确的是( )。A.工程质量的波动大而变异小 B.工
工程项目质量控制系统是以()为对象,由项目监理机构负责建立的面向监理项目开展质量
如图2-3所示,一定量的理想气体,沿着图中直线从状态a(压强p1=0.4MPa,
矿井投产工期是指从()之日起到部分工作面建成,并经试运转,试生产后正式投产所经历
最新回复
(
0
)