首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
67
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] The scientists are testing how to distribute and adapt the flood prediction calculation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3315157.html
相关试题推荐
Theproblemsthemselvesarestillnottrulystrategicbecausetheoperationoft
Stopdwellingonyourproblemsanddosomethingaboutthem!A、abidingB、lingering
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[originaltext]
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
Thereisn’tanyreal(different)______instructurebetweenthesetwopointsof
TheMonaLisaisshowingherage,museumcurators(馆长)inParissaidwhilea
下列哪项是员工工资的组成项目及各自所占比例?()A.工资水平 B.工资级差
TheFileTransferProtocol(FTP)isast
监理工程师针对综合布线系统实施质量监控时,应及时发现事故的苗头和潜在的质量隐患,
29岁,停经43天,血HCG260μg/ml,结合超声图像,最可能的诊断为 A
回答单桩竖向抗压极限承载力现场检测技术的相关问题。1)基桩竖向受荷载作用的极限承
关于市净率估值方法,下列说法正确的有()。 I.对于极易通过资产重置来复制盈利
简述《义务教育法》的立法宗旨。
根据工程质量事故造成的人员伤亡或直接经济损失,()属于较大质量事故的条件。A.
最新回复
(
0
)