首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2023-09-26
50
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
noise problems
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3046199.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
______fromspace,ourearth,withwatercovering70%ofitssurface,appearsas
随机试题
RecyclingTheconceptofgreenconsumerismhasgai
Scientistsaretryingtomakethedesertsintogoodlandagain.Theywantto
HowtoReinventCollegeRankings:ShowtheDataStudentsNeedMostA
不属于固定阳极X线管组成的是A.轴承 B.靶面 C.集射罩 D.灯丝 E
临床应用的肝酶谱中,反映酒精性肝炎的血清酶为()。A.ALT B.AST
电容器切除后,须经充分放电后(必须在()分钟以上),才能再次合闸。因此在操作
借款人在合同履行期间申请调整分期还款额,在提前部分还款后,对于希望保持原贷款期限
WAIS-RC各分测验的量表分的平均数为10,标准差为()。 A.1.5 B
A.24.7 B.43.5 C.68.2 D.74.6
对于采用装配式钢筋混凝土结构的建设工程,不能列入施工进度计划的是()。A.
最新回复
(
0
)