Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2023-09-26
51
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
the pipe way
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3046198.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
WhatdoweknowaboutTB?[originaltext]Anewstudyshowsthatredesigningm
I’msorryIdon’tknowhistelephonenumber.IwishI__________________________
Whatkindofprogramisit?Itisa________.[originaltext]Whatkindofprogra
Theaccidentwasreportedtohaveoccurred[originaltext]Anaircraftcarrying
Theoldladyhas______twowarsandrevolutions.A、livedonB、livedthroughC、live
女性,35岁。8年前因胃出血行胃大部切除术,近1年来乏力、头晕、面色渐苍白,平时
一般而言,各类基金的收益特征由高到低的排序依次是()。A:债券型基金、股票型基金
保钾作用最强的利尿剂是A.乙酰唑胺 B.氢氯噻嗪 C.呋塞米 D.氨苯蝶啶
由承包方承担实物工程量、工程单价等变化而可能造成损失的风险的合同是()。A.估算
某土方工程某月计划开挖9000m3,合同单价30元/m3,到月底实际完成土方量为